The EU Nature Restoration Regulation sets legally binding restoration targets and obligations for Member States. It covers habitats and ecosystems across the EU, from rivers and wetlands to farmland, forests, cities and seas.
This guide explains how national restoration plans turn those requirements into planned action and what landowners, municipalities and project teams can look for when developing a restoration project.
EU Nature Restoration Regulation Explained
The EU Nature Restoration Regulation sets binding restoration targets and obligations for Member States. It covers habitats across the EU, from rivers and wetlands to farmland, forests, cities and seas.
This guide explains what the targets require, how national restoration plans are assessed and what landowners, municipalities and project teams can look for as they develop restoration projects.
What Does the EU Nature Restoration Regulation Require?
Regulation (EU) 2024/1991 entered into force on 18 August 2024. Its overarching aim is for Member States to put restoration measures in place that jointly cover at least 20% of the EU’s land areas and at least 20% of its sea areas by 2030. By 2050, the aim extends to all ecosystems in need of restoration. The regulation also contains separate targets and obligations for particular habitats and ecosystems.
The area covered by measures and the ecological condition reached are two different things to track. For instance, a project may restore a stream’s connection to its floodplain in one construction season. Changes in vegetation, sediment and habitat use can take years. Good project records show both when the work was done and how the site responded.
The 20% figures apply jointly across the EU. To understand what applies in a particular landscape, start with the relevant article and habitat, then check how the Member State is planning to implement it. An overview of biodiversity in Europe provides the ecological context for those choices.

Which Targets Apply to Habitats, Rivers and Peatlands?
For terrestrial, coastal and freshwater habitat types listed in Annex I that are in poor condition, Article 4 requires measures on at least 30% of the relevant total area by 2030, subject to the article’s detailed provisions. The 2040 and 2050 milestones are set for each habitat group. Marine habitats have their own requirements under Article 5.
The regulation also addresses river connectivity, pollinator decline, urban green space and tree canopy, and indicators for agricultural and forest ecosystems. For rivers, Member States inventory artificial barriers and identify those to remove, contributing to an EU objective of at least 25,000 km of free-flowing rivers by 2030.
For drained peatlands in agricultural use, the regulation sets restoration targets with a share to be rewetted. It specifies that the rewetting obligation does not imply an obligation for farmers and private landowners to rewet their land. A proposed project still needs a site-specific review of water impacts, land use and permissions.

Restoring Coastal and Marine Ecosystems
Marine restoration begins with understanding pressures at the site and in the surrounding waterbody. Poor water clarity, disturbance and damage to the seabed can limit recovery even where a suitable habitat was present historically. A seagrass project, for example, needs to examine depth, light, sediment and the likelihood that the original pressure can be reduced.
Article 5 sets out separate marine restoration provisions. Use the relevant marine habitat definitions and national marine information when assessing a proposal. In coastal work, clarify which authority is responsible for the seabed, water quality and adjacent land. Monitoring may need to account for both local management and pressures that originate upstream or offshore.

Restoring Pollinators in Agricultural Landscapes
A pollinator project can combine species-rich field margins, nesting places and management that maintains flowering resources across the season. Begin with the gaps in the local landscape. A site with spring forage but little late-summer flowering needs a different intervention from a site where nesting habitat is scarce. Assess pesticide exposure and the continuity of nearby habitat with the land manager.
Record which plants are flowering during repeat surveys, the conditions during each visit and the survey effort. A short flush of flowers can improve forage without establishing whether pollinator populations are recovering. The regulation includes a requirement to reverse pollinator decline by 2030, followed by an increasing trend until satisfactory levels are achieved. Project indicators should help explain how local work contributes to that wider objective.

Restoration in Towns and Cities
An urban project may work with street trees, parks, open waterways and green areas around buildings. Assess where canopy is already established and where continuity can be improved. A mature tree provides shade and habitat immediately, while a new planting may take years to develop an equivalent canopy. Retention, planting and long-term maintenance therefore belong in the same assessment.
The regulation addresses urban green space and tree canopy at Member State level, subject to the provisions in Article 8. Check which urban ecosystem areas have been defined nationally before interpreting the relevance of a local proposal. Map canopy by neighbourhood, land ownership and planting constraints. If the project aims to improve ecological connectivity, consider gaps between existing habitat as well as the total area.

How Do National Restoration Plans Work?
Member States were required to submit draft national restoration plans by 1 September 2026. A plan sets out where and how the state intends to meet the targets, including the measures, timing, monitoring and financing needs. The EU has adopted a common format for national restoration plans so the information can be reviewed consistently.
The Commission assesses each draft within six months of receipt. It may send observations, and the Member State must address them and finalise, publish and submit its plan within six months of receiving them. The European Commission’s regulation overview provides implementation updates.
For a project team, distinguish the current national draft from a final plan, a funding call and a site permit. They answer different questions. Check the date and status of any map or measure you use, especially where planning documents are being revised.

How Can Project Teams Use the Plans?
Begin with the ecological problem. In a drained floodplain, check where embankments, channels or drainage controls interrupt natural flows. Map ownership, access and upstream and downstream effects before choosing a measure. Then compare the site with the habitats, pressures and locations described by the relevant national authority.
A useful project brief records the site boundary, current condition, proposed measures, permissions, landowner arrangements and long-term management. Set an expected outcome for each action. Reconnecting a side channel might be assessed through seasonal inundation and habitat structure, alongside records of works completed.
Use the plan to frame a discussion with local authorities and potential partners. For practical methods and design choices, see our guide to ecosystem restoration.

What Should Projects Monitor and Report?
Separate evidence that the measure was installed from evidence that the ecosystem is recovering. A dated works log and mapped intervention boundary document delivery. Repeat field surveys, water-level records and fixed photographs can show whether conditions are moving in the intended direction.
Choose indicators that fit the habitat and the decision the team will make. Survey in comparable seasons, record extreme conditions and retain raw data where possible. National reporting obligations sit with Member States, while individual projects may also have monitoring requirements under a permit, funding agreement or management contract.
Discuss evidence requirements before starting work so that the first field season can establish a usable baseline. Our guide to biodiversity measurement and monitoring explains baselines, methods and data quality.

From a Plan to a Fundable Project
Once the ecological need and the potential measure are clear, build a schedule that covers permissions, agreements and delivery windows. A project can be well aligned with national priorities and still face unresolved questions about access, maintenance or impacts on adjoining land. Early conversations with the relevant authority and landowners help reveal those dependencies.
Prepare a budget for surveys, construction or management, follow-up and contingencies. Define which costs are covered by an existing scheme and which need separate funding. If reporting outcomes is part of the funding agreement, agree what counts as evidence and who is responsible for collecting it. Keep a clear record of where funding and claims overlap.

How Initiative 14/15 Supports Restoration Projects
Initiative 14/15 works with landowners, businesses and public organisations to explore ecosystem restoration and measurable environmental outcomes. An early discussion can help clarify the ecological opportunity, identify information gaps and define what a feasible project would need to demonstrate.
Bring a site map, a short description of present land use and any survey or water data you already hold. We can use that information to discuss priorities for assessment and the next steps in project development.
Frequently Asked Questions
When did the regulation enter into force?
It entered into force on 18 August 2024.
Who is responsible for national restoration plans?
Each EU Member State prepares its own plan and submits it to the European Commission.
What does the 20% target refer to?
It refers to the land and sea area covered by restoration measures across the EU by 2030.
Does the regulation cover the sea?
Yes. Article 5 sets separate restoration requirements for marine ecosystems.
What is the EU river connectivity objective?
The EU aims to restore at least 25,000 km of rivers to a free-flowing state by 2030.
Does it require every private landowner to rewet peatland?
No. The regulation explicitly distinguishes the Member State’s rewetting obligation from a private landowner’s decision.
Can a restoration plan grant a project permit?
Project permits are dealt with under the applicable permitting rules. A national plan sets out priorities and measures.
Are projects eligible for funding automatically?
Funding depends on the relevant programme, its criteria and the application process.
Where can I find the legal wording?
The full text is published as Regulation (EU) 2024/1991 on EUR-Lex.
What should I prepare before discussing a site?
Start with a boundary map, current land use, known constraints and any existing ecological or hydrological surveys.
Develop a Restoration Project
Tell us where the site is, what is limiting recovery and what you hope to improve. We can discuss where to start and what evidence or partnerships would help take the project forward.
If you are still exploring options, share what you know about the site and any decisions you need to make.
Get in Touch